Date:

september 2013

Service:

Integral Factory Automation

Sector:

Water treatment

The constructor COPCISA trusts again with Voltec to implement part of the works of the Lleida water infrastructure.

Voltec Electrosistemes, S.L. It has been the contractor of electrification and automation sector 6 Segarra-Garrigues canal. An award that comes from the hand of COPCISA, one of the leading companies in the construction sector in Spain and which is responsible for implementing the Sector 6 of this water infrastructure being made in the province of Lleida. In this regard, we note that it is not the first time that COPCISA trust Voltec for part of the works of this channel, as previously awarded the construction Lleida electrification and automation engineering sector 3 of the same infrastructure. < br />
work VOLTEC implantation consist of 5 impulsion pumps 710 VAC to 690 KW each. The installation of these pumps will the existence of a power 5.150KW to move a flow of 2,203 m3 / hour. A supply flow rate in this sector, municipalities Ciutadilla, Granyena de Segarra Montornès de Segarra, Nalec, Preixana, Sant Martí de Riucorb, Tarrega, Verdú and Vilagrassa.

So VOLTEC participates in the construction of irrigation infrastructure larger than those built in Catalonia so far. A work that will strengthen the water supply for industrial uses mouth and 70 municipalities. In all six counties will benefit from a system that will take electricity and supply water to 72,000 people. An infrastructure that represents an investment of 1,500 million euros and 16,000 irrigators will benefit.